ICME was invited by RASCO on October 2020 to submit an offer for upgrading project for gas turbine control system ,ICME with great cooperation with PETROTECH which licenced by GE , specialized company in this sector and submitted best offer technically and commercially and win this great project on December
2021.
ICME Partner , Petrotech is a recognized global provider for some of the most advanced and sophisticated control systems and solutions available in the world today. Our integrated control systems provide complete or partial control system retrofits for gas turbine driven packages for compression, power generation and pumping applications. These systems provide replacement and enhancement controls for outdated electro- hydraulic, analog-electronic, relay and pneumatic based control equipment.
The project include Engineering, procurement, installation, commissioning in addition to Hot gas Path inspection ( HPI) and training . the scope include and not limited to engineering, supply and install the following :
• Allen Bradley ControlLogix Programmable Logic Controller (PLC) based on a simplex CPU
configuration.
• 15” Industrial HMI touchscreen color monitor
• Critical Function Redundancy (CFR) Assembly
• Painted carbon steel Turbine and Generator panel
• ABB UNITROL 1020 ( Voltage requlater
• Basler DECS-250 Digital Voltage Regulator System
• Schweitzer SEL-700G Generator Protection Relay
• Woodward SPM-D2 Synchronizer
• Allen Bradley Power Monitor 1000. Un-managed Ethernet switch.
• Redundant Power Supply with LoadShare Module
• Metrix Vibration Transmitters
• System Manuals on CD-ROM (2 sets).