Based on requirements for a higher level of performance in-service which in turn, reduces the overall operating cost of the line.ICME have done some activities as follow: .
- 220 KV Glass and Porcelain insulators cleaning, suspension and tension towers (Sirte, Zamzam Misurata, Alkhomose, Tarhona and Tripoli)
- Optical Ground Grounding Wire (OPGW), the work have done can be stated as follow:
- Removing old Optical Ground Grounding Wire with its accessories.
- Steering Optical Ground Grounding Wire with its accessories.
- Install the joint box in proper place in the tower
- Weld the terminals of OPGW in the joint box.