This is to certify that, the Gas Turbine GT-1 at Sirte oil Company, Oil & Gas Power station area one has been under major overhaul by’ ICME-Company, from 09.10.2021 and today 8.12.2021 is being handed over back to SOC responsibility after the completion of 48Hrs reliability run test.
The machine has returned back to SOC Electric network with smooth running, normal operation parameters and vibration readings within the acceptable standard limits